HSE-Approved Demolition Worker RAMS Template
Systematic dismantling of structural building components, concrete breaking, and site clearances. Download and generate complete Risk Assessments and Method Statements (RAMS) perfectly customised with pre-selected hazards, control measures, and PPE checkgrids.
Pre-Configured HSE Hazards & Mitigation Controls
When you initiate a RAMS record for the Demolition Worker trade, the system automatically imports this library of hazards and pre-populates safety controls. You can toggle, customize, and edit these directly inside Step 3 of the stepper.
Premature collapse of floors, walls, or columns trapping or crushing demolition personnel.
Adhere strictly to a pre-approved sequence of demolition (top-down), install temporary shoring/bracing where required, and establish clear mechanical exclusion zones.
Inhaling toxic asbestos fibers or high-concentration respirable crystalline silica causing lung cancer or silicosis.
Conduct a comprehensive asbestos survey before starting, utilize professional wet demolition/suppression techniques, and mandate the wearing of FFP3 respirators/protective overalls.
Workers being struck by excavators, high-reach demolition rigs, or tipping trucks.
Enforce complete segregation of pedestrians and heavy machinery, mandate high-visibility clothing at all times, and employ trained marshals/banksmen for plant movements.
Accidental spark or ignition of severed live gas, fuel lines, or stored cylinders.
Verify 100% isolation of gas, electric, and water services prior to work, trace lines manually, and keep dry powder fire extinguishers at hand.
Demolition workers falling through pre-weakened concrete floors or down open lift shafts.
Install robust physical barriers and warning signage around all internal voids, lay heavy timber staging, and utilize safety harnesses.
Discarded drug needles, rodent infestations, or toxic pigeon guano (causing Psittacosis).
Carry out a pre-demolition clean-up/needle sweep, wear FFP3 RPE and disposable Tyvek overalls when handling pigeon guano, and disinfect cuts immediately.
Brick fragments, timber beams, or masonry parts launching outwards from active demolition zones and striking people.
Erect double-height perimeter hoarding, hang high-tensile debris nets, enforce safety helmets, and position watchmen to manage public access.
Prolonged exposure causing permanent occupational hearing loss or acoustic shock.
Mandate high-attenuation double ear protection (earplugs + defenders EN352), acoustic enclosures on plant, and restrict operations to designated hours.
Severe nerve, joint, and circulatory damage in forearms and hands from continuous jackhammer use.
Install vibration-dampening grips, establish strict trigger time logs (max 2 hours daily per person), and provide heated hand warming stations.
Puncture wounds or lacerations from jagged rusty metal reinforcing rods, structural steel shards, or broken window panes.
Wear EN388 level E cut-resistant mechanical safety gloves, and heavy-duty safety boots fitted with steel mid-sole puncture protection.
Thermal skin burns, slag splatters, or eye injuries from hot steel cutting or gas-welding.
Wear full leather protective clothing (welding coat, gauntlets, spats), use shaded cutting goggles (shade 5), and clear all flammable materials within 10 meters.
Inadequate oxygen levels, build-up of explosive fuel gases, or sudden wall cave-ins trapping workers inside.
Perform pre-entry atmospheric gas testing, set up continuous forced air ventilation, and mandate safety harness lines with a rescue buddy on winch watch.
Recommended Personal Protective Equipment (PPE)
Standard health and safety site requirements require active safety protective wear. Select these instantly in the Stepper’s Visual Grid.
Frequently Asked Questions for Demolition Workers
What surveys are legally mandatory prior to demolition?
A Refurbishment and Demolition Asbestos Survey (RDAS) and structural engineer load assessment must be completed before commencing structural knockdown.
How are vibration and noise exposure levels monitored?
HAVS (Hand-Arm Vibration Syndrome) trigger times must be calculated using HSE points systems for breaker tools, rotating operatives every 60 minutes.
Trade Industry Standards
- •HSE British Standard BS 6187 Code of Practice for Demolition
- •CDM Regulations 2015 Compliance
- •Asbestos Licensing Standards
Legal Disclaimer
RAMSMate templates comply with direct UK HSE guidelines and construction regulations. Under the CDM 2015 regulations, contractors and employers maintain ultimate legal responsibility for verifying precise site hazards, training workers, and enforcing appropriate safety controls.