Back to Pricing Plans
HSE Compliance Risk Library

HSE-Approved Scaffolder RAMS Template

Erecting, altering, and dismantling temporary structural scaffolding and access towers on commercial sites. Download and generate complete Risk Assessments and Method Statements (RAMS) perfectly customised with pre-selected hazards, control measures, and PPE checkgrids.

Wizard Quick Actions
Free Trial Availability Active (Lite)
Risk Level AnalysisHSE High Risk
Compile Scaffolder RAMS

Pre-Configured HSE Hazards & Mitigation Controls

When you initiate a RAMS record for the Scaffolder trade, the system automatically imports this library of hazards and pre-populates safety controls. You can toggle, customize, and edit these directly inside Step 3 of the stepper.

Falls from height during assembly/dismantlingHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Unsecured scaffolders falling from height before edge protection is established.

🛡️ Safety Control Measures (Mitigation)

Wear a full-body harness with a double lanyard, practice 100% clip-on technique to suitable anchor points, and utilize advanced guardrail systems (Shoring/Scaffolder's Safe Zone).

Manual handling of heavy steel standards and ledgersMEDIUM RISK
⚠️ Hazard Assessment (Potential Injury)

Repetitive lifting, carrying, and passing of heavy poles leading to musculoskeletal injuries.

🛡️ Safety Control Measures (Mitigation)

Perform team lifting for large poles, rotate duties, use hoists or gin wheels, and ensure adequate footing before lifting.

Collapse of scaffolding structureHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Unstable or poorly designed scaffolding collapsing under load.

🛡️ Safety Control Measures (Mitigation)

Erect scaffold only by competent, certified scaffolders, tie the structure to solid anchor points, inspect weekly and after bad weather, and never exceed maximum design loads.

Dropped objects / Fittings striking third partiesHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Scaffold fittings, clamps, boards, or tools falling onto other workers or members of the public.

🛡️ Safety Control Measures (Mitigation)

Establish rigorous exclusion zones underneath erection zones, use brick guards, secure all hand tools with lanyards, and wear safety helmets.

Overhead Power Lines & electrical clearanceHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Scaffold tubes or metal structures coming into contact with live overhead power lines.

🛡️ Safety Control Measures (Mitigation)

Maintain a minimum safe distance of 15 meters from overhead lines on wooden poles (or 6m with barriers), and consult the electricity provider before commencing.

Slips and Trips on scaffold platformsMEDIUM RISK
⚠️ Hazard Assessment (Potential Injury)

Planks made slippery by mud, water, ice, or cluttered with excess fittings.

🛡️ Safety Control Measures (Mitigation)

Keep platforms clear of loose fittings/debris, use grit or salt on icy planks, inspect boards for splits or warping, and maintain neat storage stacks.

High winds and extreme weatherHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Loss of footing, balance, or scaffolding board displacement during storm force winds or heavy rain.

🛡️ Safety Control Measures (Mitigation)

Constantly monitor wind speeds using on-site anemometers, suspend all scaffold works if average wind speed reaches 23 mph, and secure all loose boards before leaving site.

Eye injuries from metal chips/rust scalingLOW RISK
⚠️ Hazard Assessment (Potential Injury)

Rust flakes, metal scaling, or galvanized coatings breaking off tubes and entering eyes during coupling or hammering.

🛡️ Safety Control Measures (Mitigation)

Enforce mandatory wearing of safety glasses with side shields during all scaffold assembly and dismantling works.

Crushing of fingers/hands during couplingMEDIUM RISK
⚠️ Hazard Assessment (Potential Injury)

Fingers getting pinched or crushed between heavy metal clamps and tubes during tightening or locking.

🛡️ Safety Control Measures (Mitigation)

Wear heavy-duty split-leather or impact-resistant gloves (EN388), use the correct size scaffolding spanners, and maintain a secure grip.

Working on un-decked/incomplete platformsHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Workers accidentally stepping onto empty transoms or unanchored boards, leading to severe falls.

🛡️ Safety Control Measures (Mitigation)

Affix highly visible 'Scafftag - DO NOT USE' warnings on incomplete sections, install temporary double guardrails, and block access ladders.

Structural overloading of scaffold platformsHIGH RISK
⚠️ Hazard Assessment (Potential Injury)

Excessive storage of heavy bricks, mortar, or structural beams on a platform, causing buckling or collapse.

🛡️ Safety Control Measures (Mitigation)

Clearly calculate and signpost the maximum load-carrying class of each scaffold section, and enforce a strict clean-deck policy daily.

Public interface hazards (access control breaches)MEDIUM RISK
⚠️ Hazard Assessment (Potential Injury)

Members of the public or children attempting to climb incomplete or unsecured scaffolds outside working hours.

🛡️ Safety Control Measures (Mitigation)

Remove or securely board over the bottom lift of all access ladders at the end of every shift, and install secure anti-climb perimeter fencing.

Recommended Personal Protective Equipment (PPE)

Standard health and safety site requirements require active safety protective wear. Select these instantly in the Stepper’s Visual Grid.

🪖 Safety Helmet with Chin Strap (EN397)
🧗 Full-Body Fall Arrest Harness (EN361)
🥾 High-Traction Safety Boots
🧤 Split-Leather Impact Gloves (EN388)

Frequently Asked Questions for Scaffolders

What standards govern temporary scaffolding erection?

All scaffolding must comply with NASC TG20:21 guidelines, BS EN 12811, and the Work at Height Regulations 2005, with weekly Scafftag inspections.

What fall arrest systems are mandatory for scaffolders?

Scaffolders must wear a full-body harness with a shock-absorbing lanyard and scaffold hooks, clipping onto certified anchor points whenever working outside guarded platforms.

Trade Industry Standards

  • NASC TG20:21 Operational Guide
  • Working at Height Regulations 2005
  • BS EN 12811 Scaffolding Standards

Legal Disclaimer

RAMSMate templates comply with direct UK HSE guidelines and construction regulations. Under the CDM 2015 regulations, contractors and employers maintain ultimate legal responsibility for verifying precise site hazards, training workers, and enforcing appropriate safety controls.

Go Pro Unlimited

Unlock full PDF document generation, remove watermarks, insert your custom branding logo, and enjoy secure digital audit validation logs.

Review Premium Tiers
Scaffolder Risk Assessment TemplatePreloaded HSE Control Measures and PPE configurations.
Generate Scaffolder RAMS